Skip to main content

Chama Meeting 02_1_2023

February 1, 2023

Jacob Specht

1.0

Chama22 Meeting Notes 2/1/2023

  • Parentheses ( ensemble ) for the scenarios. Done
  • Rain gauge count to the footer, or column for which model (E6 or Banklick). Done
  • Land area in subcatchment is possible sensor location.
  • Which subcatchments to target. The ones that contain the potential sensor locations. If possible. If you have questions don’t spin around ask Melissa. (If needed random will do) Deven for Banklick using QGIS.
  • Different technology when applied to the land as opposed to normal SWMM water sampling type sensors.
  • Buildup could be measured both ways, including when levels have reduced enough for safe return (instead of looking at buildup level to evacuate).
  • In general, first responders will be more interested in hotspots on the land, unlike water people who look at outfalls.
  • Subcatchment ID and buildup number are key values of interest.

Next Steps

  • Set up office hours. Anne needs to look at calendars and will send out an invite this week or next week.
  • Include KR’s Email into docs
    • Call the API E6 what timeseries Melissa gets for all the subcatchments